On 8 November 2018, the PRA published a direction concerning the notification that EEA firms must make should they wish to obtain a deemed permission or variation under the temporary permissions regime.

The PRA directs that a notification must:

  • be made by submitting the temporary permission notification form using the Connect system (https://connect.fca.org.uk);
  • contain the information required by that form; and
  • be made during the period beginning at 9am on 7 January 2019 and ending with 28 March 2019.